Settings for Production - Operations management
Setting name | Description |
Move mode for Operation Planner | "Value in this setting for 'Movemode for the PLANNER/GANT' must be one of these alternatives: MINIMAL: Only move this Almanac (ALM) element, do not touch the remaining operations, unless this element is moved in front of/after an adjacent operation, in which case those operations affected will be moved according to the rules of PACK. SINGLE: Only move this Almanac (ALM) element, fail if moved across prev/next. SIMPLE: Only move this Almanac (ALM) element, do not touch the remaining operations, dont care about conflict. Even possible to move started Operations or move them to before SYS.DATE/TIME" |
Operation ID used in Rework | Value in this setting is a default Operation (OPR) needed to perform a Rework Production Work Order |
Production Work Order Picking Operation ID | Value in this setting must be the Operation (OPR) that should be used in the structure for new Products (ART) that is loaded from PDM systems (CAD-design). The files only contains the parts that should be used in the Product, and the Operation will be picked from this setting |
Wait For External Planner to start Operation | If setting is 'ON' - operations should be put on hold until release-signal is given from the external planner. |