Settings for Manufacturing record book (MRB)
These settings can be edited in the Company settings under Production and then Production again.
Setting | Description |
---|---|
Use document requirements for production | Generate document requirements (RQM) and planned documents requirements (RQT) for production work orders (PWO) based on file types (FIT). |
Create and include COC in MRB | Include Certificate of Conformity in MRB documentation |
Create and include FII tracelist in MRB | Include Free Issue Items (FII) tracelist in MRB document. Free issue items is customer owned goods. |
Create and include MCL tracelist in MRB | Include Material Certificate List (MCL) tracelist in MRB document. |
Create and include MTL tracelist in MRB | Include Material Trace List (MTL) tracelist in MRB document. |