Load Production resources (RESCONFIG) - INP/73367
This load will not update existing Production resources (RESCONFIG).
Possible fields to be loaded into RamBase are listed in the Field column in the following table. The other columns in this table provide additional information about each field.
Field | Required | Length | Example | Description |
---|---|---|---|---|
ALLOWGROUPING | 1 | Set value 1, to allow resource to use work order operation grouping. | ||
ALLOWMANHOURS | 1 | Set value 1, if man hours can be added to the the work log of work order operations. | ||
ALLOWMULTIOPERATOR | 1 | Set value 1, if multiple operators can work with one work order operation. | ||
ASSIGNTORESTRICTEDSTOCKLOCATIONS | 1 | Set value 1, if the Production resource (RESCONFIG) should be assigned to restricted stock locations. | ||
CALCULATECOSTBYPLANNEDHOURS | 1 | Set value 1 = Operation cost is calculated based on planned operation hours. Blank (Default) Operation cost is calculated by logged hours. | ||
CATEGORY | Y | SINGLE | Production resource (RESCONFIG) category. Legal values are SINGLE, MEMBER or GROUP. | |
CLASS | Y | V | Production resource (RESCONFIG) class. | |
EXTID | Production resource (RESCONFIG) external system id. | |||
GROUPID | Production resource (RESCONFIG) group id. | |||
HOURRATE | 100 | Rate per hour for operations step, given in system currency. | ||
HOURRATEPOST | 100 | Rate per hour for operations post step, given in system currency. | ||
HOURRATEPRE | 100 | Rate per hour for operations setup step, given in system currency. | ||
NAME | Y | Name of Production resource (RESCONFIG). | ||
NOTE | Description of the Production resource (RESCONFIG). | |||
SHORTNAME | Short name of Production resource (RESCONFIG). | |||
ST | Y | 4 | Status. Must be 1 or 4. |