Load Production operations (OPR) - INP/73368

This load will not update existing Production operations (OPR).

Possible fields to be loaded into RamBase are listed in the Field column in the following table. The other columns in this table provide additional information about each field.

Field

Required

Length

Example

Description

CHECKPOINTDESCRIPTION

Checkpoint description.

CHECKSERIALNOONPARTS

1

Set value 1, if it require serial number before completion. Then all items in the tracelist for all product units needs to have serial number assigned.

DESCRIPTION

Description of the Production operation (OPR).

EXTID

The Production operation (OPR) external system id.

HASCHECKPOINT

1

Set value 1, if the Production operation (OPR) has a checkpoint set.

OPCLASS

Y

Production operation class.

OPERATION

Y

Name of the Production operation (OPR).

OPPOSTTIME

1.5

Planned cleanup time in hours for the Production operation (OPR). 1h 30min is given as 1.5.

OPPRETIME

Y*

1.5

Planned setup time in hours for the Production operation (OPR). 1h 30min is given as 1.5. * Either OPTIME or OPPRETIME must be specified.

OPTIME

Y*

1.5

Planned run time in hours for the Production operation (OPR). 1h 30min is given as 1.5. * Either OPTIME or OPPRETIME must be specified.

PICKINGMUSTBECOMPLETED

1

Set value 1, if picking must be completed. Then all parts for this and previous operations must be picked before current operation can be completed.

RESEXTID

Y**

Resource (RES) id in the external system. ** Either RESOURCENO (100000) or RESEXTID must be included.

RESOURCENO

Y**

100000

Resource (RES) id in RamBase. ** Either RESOURCENO (100000) or RESEXTID must be included.